Home/Case Studies

Case Studies

The results speak for themselves.

Faster lettings, vacant space put to work, businesses online from day one, and buildings made genuinely tenant-ready. A look at what happens when connectivity, IT, security and property services come from one accountable partner.

CASA
Day oneSatellite connectivity operational from installation
Data Connectivity via Starlink

Fuse find a great connectivity solution in Great Park

After 12 months without a working connection and a cancelled order due to missing infrastructure, CASA's Great Park office is now online via Starlink, installed by Fuse partner NEIT Solutions, once 5G testing proved unreliable. It shows how Fuse finds the right connectivity solution for the building rather than forcing a fixed answer that doesn't fit the site.

Read the case study
Akenside Studios
24 hrsTo the first walk in viewing
Digital Screens, with Fuse Footfall

The building that advertised itself

Akenside Studios on Newcastle's quayside had vacant offices to let and a prominent ground floor window. Fuse installed high resolution screens displaying the building's own office availability alongside paid campaigns, with an integrated footfall counter to measure the position. The screens caught the attention of a potential tenant within 24 hours of the screen going live, and a walk in viewing was carried out immediately.

Read the case study
King's Square Shopping Centre
1 weekFrom order to working connection
Data Connectivity (5G)

Getting Kings Square Shopping Centre back online

King's Square Shopping Centre turned to Fuse after a long-running account issue left the management office without broadband. With limited fixed-line infrastructure available, Fuse provided a fully tested 5G solution with unlimited data, getting the centre back online within a week and allowing essential CCTV footage to be downloaded and backed up again.

Read the case study
St Cuthberts Hospice
24 hrsFrom go ahead to taking card payments again
Data Connectivity (5G)

The shop that could not take a card

Two St Cuthbert's Hospice shops in County Durham were losing card sales, and one of them could not be connected over the fixed network at all. Fuse specified 5G as the primary connection at both sites and had them installed and trading within 24 hours. The shops fund patient care, so restoring the till restored the income.

Read the case study
Parker Knights
24 hrsFrom go ahead to working
Data Connectivity (5G), with the Connectivity Checker as the diagnostic

Working the next day

Parker Knights bought their own Newcastle office and needed to work from it straight away. Full fibre was available at the address but the install lead time was not, so Fuse put in an immediate 5G connection and had them operating within 24 hours. It performed so well they kept it as the permanent connection.

Read the case study
Bridgerton for Netflix
Data Connectivity

What a Regency ballroom and a 5G router have in common

How Fuse kept the cast and crew of Bridgerton connected on location, and why the way we did it still shapes how we work today.

Read the case study
Leisure and events, temporary venue
ZeroFixed lines needed on site
Data Connectivity, rapid deployment hire

A cinema with no building

A contact free drive in cinema opened on an open site at Meridian Water in north London, where tickets were scanned through closed car windows and orders came from a phone. There was no building, no incoming line and nothing to plug into. Fuse assessed the site, specified four 4G routers with unlimited data and automatic carrier failover where an outage would have stopped trading, and supplied it all as a hire for the run.

Read the case study
Utilities, live streamed event
3Mobile networks behind a single broadcast
Data Connectivity, rapid deployment event network

One network failed. Nobody watching knew.

A live streamed event to employees and management needed a connection that could not drop, delivered on mobile in a building where Fuse controlled none of the networks. Two multi network routers carried SIMs across three carriers, tested in position the day before. One network failed during the event, the routers switched automatically, and the broadcast never faltered.

Read the case study
Aberdeen Standard
TwoBuildings in the same ownership brought to the same standard
Pre-Connected Properties

Two buildings, one standard

Stockbridge House on Trinity Gardens sits in the same ownership as its neighbour and had assessed a rung lower under WiredScore. Fuse applied the same specification to both: a one gigabit fibre backbone with a diverse wireless route alongside it, tenant shares of 10 to 100Mbps available before occupation, and a managed guest network. The estate now offers the same proposition whichever building an occupier takes.

Read the case study
Aberdeen Standard
1GbShared backbone into the building
Pre-Connected Properties

One gigabit, shared by the whole building

A multi-let office on Broad Chare in Newcastle held a WiredScore Gold rating and its owner wanted Platinum. Fuse put two leased lines into the building on separate routes, a one gigabit fibre backbone and a wireless link from a neighbouring rooftop, so a cable cut in the street cannot take the building off air. Tenants take shares of 10 to 100Mbps and can be connected before they move in.

Read the case study
Events, industrial site
135Devices connected at once at peak
Data Connectivity, rapid deployment event network

135 devices, no fixed line, nothing to fall back on but design

An investor day at the closing Michelin tyre factory in Dundee needed a network for up to 300 delegates on a site with no usable fixed connectivity. Fuse deployed four dual SIM routers across two mobile carriers with automatic failover, six access points covering the site as one roaming network, and proved the whole thing on site a month beforehand. It carried 135 simultaneous connections and 32GB of data across the day.

Read the case study
Corporate events, heritage venue
ThreeMobile connections bonded into one
Data Connectivity, rapid deployment hire

Live from Morocco, into a fortress

A Souter Investments event at Stirling Castle, hosted by Sir Brian Souter, was built around a live interview with Sir Richard Branson joining from Morocco, inside walls built to withstand attack and just as effective against a radio signal. Fuse bonded three mobile connections into a single link, put an entirely separate backup router behind it, and installed the day before with an engineer on site throughout.

Read the case study

Let’s talk

Want results like these?

Tell us what you are trying to fix, and we will show you how the pieces fit for your business or your building.